АвтоАвтоматизацияАрхитектураАстрономияАудитБиологияБухгалтерияВоенное делоГенетикаГеографияГеологияГосударствоДомДругоеЖурналистика и СМИИзобретательствоИностранные языкиИнформатикаИскусствоИсторияКомпьютерыКулинарияКультураЛексикологияЛитератураЛогикаМаркетингМатематикаМашиностроениеМедицинаМенеджментМеталлы и СваркаМеханикаМузыкаНаселениеОбразованиеОхрана безопасности жизниОхрана ТрудаПедагогикаПолитикаПравоПриборостроениеПрограммированиеПроизводствоПромышленностьПсихологияРадиоРегилияСвязьСоциологияСпортСтандартизацияСтроительствоТехнологииТорговляТуризмФизикаФизиологияФилософияФинансыХимияХозяйствоЦеннообразованиеЧерчениеЭкологияЭконометрикаЭкономикаЭлектроникаЮриспунденкция

Financing Structure

Читайте также:
  1. CHAPTER II MORPHEMIC STRUCTURE OF THE WORD
  2. CHAPTER III CATEGORIAL STRUCTURE OF THE WORD
  3. Chapter5. MORPHEMIC AND DERIVATIVE STRUCTURE OF ENGLISH WORDS: NAMING BY WORD-FORMATION
  4. Derivative structure.
  5. Financing: Loans (1/5)
  6. Financing: Loans (2/5)
  7. Financing: Loans (3/5)
  8. Financing: Loans (4/5)
  9. Financing: Loans (5/5)
  10. Infrastructure
  11. Inner structure of the Eng W-stock

Total finance in Phase 1: AZN382.3m

Total finance in Phase 2: AZN280.5mn (Debt and Equity contributions)


Phase 1 financing structure:

GC financed the construction costs of the Phase 1 incurred till the Analysis date through the credit lines of BANK and as of the Analysis Date GC has the following debt outstanding:

Credit line 1: AZN173.5mn (including AZN 145.5 mn principal and AZN

28.0 mn capitalized interest) – 8% pa

Credit line 2: AZN204.5mn – 12% pa

■ Current interest payable balance AZN4.3mn

■ Total AZN378.0mn + AZN4.3mn interest payable

As at the Analysis date GC does not have sufficient cash-flows for the debt service payments and new terms for debt are required

It is expected that:

■ BANK will provide grace period of 10 years for the credit line of AZN 204.5 mn.

■ Interest will be capitalized during the provided grace period for this credit line

■ Interest rate will be considered 8% for all credit lines taken from the BANK

For completion phase 1 AZN 6.5 mn investment is required, which will be financed through local financing